Technical Parameters
Components Qty | 5 parts |
Cycle Time | 20-30pcs/min |
Input Voltage | 200-240VAC, 50-60HZ |
Input Air Pressure | 4.5-8.0kgf/cm2 |
Certificate | CE |
OEE | 90% |
First Pass Yield | 99.5% |
Standard Parts Brand | Panasonic, Mitsubishi, SMC, Keyence, Omron |
Requested Operators | 1 |
Machine Feature
Company Advantages
· The production technology of Yicheng electronics assembly machine manufacturer is constantly updated, and thus production efficiency is guaranteed. Thanks to the adoption of high technology, its quality is ensured.
· Our QC team is incorporated into every stage of the testing process to guarantee its quality.
· Dongguan Yicheng Automation Equipment Co.,Ltd. has a complete processing equipment, advanced technology and a sound quality control system.
Company Features
· With many years of experience in producing electronics assembly machine manufacturer, Dongguan Yicheng Automation Equipment Co.,Ltd. is developing into a strong competitor in this industry.
· Our electronics assembly machine manufacturer are made by our advanced technology.
· Yicheng Automation will continue to enrich the product line that is popular with consumers around the world. Inquire!
Application of the Product
Yicheng Automation's electronics assembly machine manufacturer can be used in different fields.
Based on the actual needs of our customers, we provide a one-stop solution for them with the purpose of rational allocation of Assembly Machine,Automated Equipment,Automatic Assembly Machine.
After we complete the assembly and debugging of the equipment, we will inspect and select appropriate packaging materials to protect the equipment from shock, moisture, and fixation.
Make sure the equipment reaches its destination in good condition.
● On site installation, debugging, training and mass production follow up.
● 1 year Warranty from date of shipment, lifetime maintenance service.
● Response any defects claims within 4 hours for mainland customers.
● 12 hours for overseas customers by telephone or mail.
● Supply remote services by smart glass, team viewer, Teams and camera.
1. The technical training described below is free technical training, and no additional fees are charged. The technical training consists of the project's on site general manager, mechanical engineer and electrical engineer, who are responsible for implementing the entire training plan.
2. The whole process of installation from the installation to the commissioning is carried out by the expert group and the production technology, equipment management and production operators designated by the customer. At the same time, the expert group is responsible for technical guidance to the customer's technical staff throughout the implementation process. Training with technical points, including:
a. Equipment system principle and operation method, maintenance.
b. Equipment operation and debugging, parameter setting.
c. Operation and application of the software.
d. Operating procedures and precautions for the equipment.
e. Safety protection measures for various action agencies.
f. Maintenance of electrical systems and mechanical parts.
g. How to make correct judgment, analysis and how to troubleshoot when the equipment fails.
h. Solutions to possible dangerous situations.