Technical Parameters
Components Qty | 5 parts |
Cycle Time | 20 pcs/min |
Pneumatic Parts | FESTO |
Electrical Parts | Siemens |
Noise | LA eq < 70dB |
Dimensions | 1.8m(L)*1.6m(W)*2.2m(H) |
Weight | About 300kg |
OEE | 95% |
First Pass Yield | 99% |
Standard Parts Brand | Panasonic, Mitsubishi, SMC, Keyence, Omron |
Requested Operators | 1 |
Certificate | CE |
Machine Feature
Company Advantages
· The offered Yicheng automated assembly equipment is provided using the finest quality raw materials in accordance with the industry norms.
· It is warranted to be free from defects in quality and performance.
· According to the requirements of customers, Yicheng has been successful into manufacturing automated assembly equipment with high quality.
Company Features
· Dongguan Yicheng Automation Equipment Co.,Ltd. is an initiator in the industry of automated assembly equipment.
· We have a team of professional manufacturing members. They are familiar with complex and sophisticated new tools, such as robotic systems or all kinds of advanced machine.
· Our companies align with a social cause. We concern about the development of our society. We devote ourselves to supplying communities with capital or resources if there are any natural disasters that happen.
Application of the Product
Yicheng Automation's automated assembly equipment can be widely used in various fields.
Yicheng Automation insists on providing customers with one-stop overall solution from the customer's point of view.
After we complete the assembly and debugging of the equipment, we will inspect and select appropriate packaging materials to protect the equipment from shock, moisture, and fixation.
Make sure the equipment reaches its destination in good condition.
● On site installation, debugging, training and mass production follow up.
● 1 year Warranty from date of shipment, lifetime maintenance service.
● Response any defects claims within 4 hours for mainland customers.
● 12 hours for overseas customers by telephone or mail.
● Supply remote services by smart glass, team viewer, Teams and camera.
1. The technical training described below is free technical training, and no additional fees are charged. The technical training consists of the project's on site general manager, mechanical engineer and electrical engineer, who are responsible for implementing the entire training plan.
2. The whole process of installation from the installation to the commissioning is carried out by the expert group and the production technology, equipment management and production operators designated by the customer. At the same time, the expert group is responsible for technical guidance to the customer's technical staff throughout the implementation process. Training with technical points, including:
a. Equipment system principle and operation method, maintenance.
b. Equipment operation and debugging, parameter setting.
c. Operation and application of the software.
d. Operating procedures and precautions for the equipment.
e. Safety protection measures for various action agencies.
f. Maintenance of electrical systems and mechanical parts.
g. How to make correct judgment, analysis and how to troubleshoot when the equipment fails.
h. Solutions to possible dangerous situations.