Technical Parameters
Components Qty | 14 parts |
Cycle Time | 20 pcs/h |
Pneumatic Parts | FESTO |
Electrical Parts | Siemens |
Noise | LA eq < 70dB |
Dimensions | 3.7m(L)*1.5m(W)*1.9m(H) |
Weight | About 1500kg |
OEE | 75% |
First Pass Yield | 90% |
Standard Parts Brand | Panasonic, Mitsubishi, SMC, Keyence, Omron |
Requested Operators | 3 |
Certificate | CE |
Machine Feature
Company Advantages
· The development of Yicheng assembly equipment manufacturers is considered from the perspective of green design.
· Apart from the quality meeting the industry standard, the product also has a longer service life compared with others.
· Dongguan Yicheng Automation Equipment Co.,Ltd.'s customer service has the ability to swallow the pride and accept blame or negative feedback.
Company Features
· Over the years, Dongguan Yicheng Automation Equipment Co.,Ltd. has achieved steady development thanks to its assembly equipment manufacturers.
· We have an in-house R&D team. They are responsible for the development of new products and the adoption of innovative ideas. They are able to exactly meet the needs of the assembly equipment manufacturers market.
· In order to reduce the impact of our products on the environment, we are devoted to consistent innovation in product design, quality, reliability, and recyclability, so as to be responsible for the environment. Contact us!
Application of the Product
The assembly equipment manufacturers produced by our company is suitable for various occasions in industry.
With many years of practical experience, Yicheng Automation is capable of providing comprehensive and efficient one-stop solutions.
After we complete the assembly and debugging of the equipment, we will inspect and select appropriate packaging materials to protect the equipment from shock, moisture, and fixation.
Make sure the equipment reaches its destination in good condition.
● On site installation, debugging, training and mass production follow up.
● 1 year Warranty from date of shipment, lifetime maintenance service.
● Response any defects claims within 4 hours for mainland customers.
● 12 hours for overseas customers by telephone or mail.
● Supply remote services by smart glass, team viewer, Teams and camera.
1. The technical training described below is free technical training, and no additional fees are charged. The technical training consists of the project's on site general manager, mechanical engineer and electrical engineer, who are responsible for implementing the entire training plan.
2. The whole process of installation from the installation to the commissioning is carried out by the expert group and the production technology, equipment management and production operators designated by the customer. At the same time, the expert group is responsible for technical guidance to the customer's technical staff throughout the implementation process. Training with technical points, including:
a. Equipment system principle and operation method, maintenance.
b. Equipment operation and debugging, parameter setting.
c. Operation and application of the software.
d. Operating procedures and precautions for the equipment.
e. Safety protection measures for various action agencies.
f. Maintenance of electrical systems and mechanical parts.
g. How to make correct judgment, analysis and how to troubleshoot when the equipment fails.
h. Solutions to possible dangerous situations.