Technical Parameters
Components Qty | 4 parts |
Cycle Time | 2.3 sec/pcs |
Pneumatic Parts | FESTO |
Electrical Parts | Siemens |
Noise | LA eq < 70dB |
Dimensions | 1.8m(L)*1.5m(W)*1.9m(H) |
Weight | About 800kg |
OEE | 85% |
First Pass Yield | 98% |
Standard Parts Brand | Panasonic, Mitsubishi, SMC, Keyence, Omron |
Requested Operators | 1 |
Certificate | CE |
Machine Feature
Company Advantages
· Yichengautomated assembly equipment has an innovative and practical design which is well-received in the market.
· The perfect product testing facilities and capable technology team ensure the performance of this product.
· By means of perfect system and advanced management, Dongguan Yicheng Automation Equipment Co.,Ltd. will ensure all production completed on schedule.
Company Features
· Dongguan Yicheng Automation Equipment Co.,Ltd. is great at manufacturing automated assembly equipment which is very easy to afford.
· Being strict in the quality assurance, our automated assembly equipment naturally gains its attention from customers at home and abroad.
· Dongguan Yicheng Automation Equipment Co.,Ltd. has affirmed its long-standing commitment of automated assembly equipment. Check now!
Application of the Product
The automated assembly equipment produced by Yicheng Automation is very popular in the market and is widely used in industry.
We work hard to develop solutions that best meet the needs of our customers based on their actual situation, so as to help each customer succeed.
After we complete the assembly and debugging of the equipment, we will inspect and select appropriate packaging materials to protect the equipment from shock, moisture, and fixation.
Make sure the equipment reaches its destination in good condition.
● On site installation, debugging, training and mass production follow up.
● 1 year Warranty from date of shipment, lifetime maintenance service.
● Response any defects claims within 4 hours for mainland customers.
● 12 hours for overseas customers by telephone or mail.
● Supply remote services by smart glass, team viewer, Teams and camera.
1. The technical training described below is free technical training, and no additional fees are charged. The technical training consists of the project's on site general manager, mechanical engineer and electrical engineer, who are responsible for implementing the entire training plan.
2. The whole process of installation from the installation to the commissioning is carried out by the expert group and the production technology, equipment management and production operators designated by the customer. At the same time, the expert group is responsible for technical guidance to the customer's technical staff throughout the implementation process. Training with technical points, including:
a. Equipment system principle and operation method, maintenance.
b. Equipment operation and debugging, parameter setting.
c. Operation and application of the software.
d. Operating procedures and precautions for the equipment.
e. Safety protection measures for various action agencies.
f. Maintenance of electrical systems and mechanical parts.
g. How to make correct judgment, analysis and how to troubleshoot when the equipment fails.
h. Solutions to possible dangerous situations.