Technical Parameters
Components Qty | 15 parts |
Cycle Time | 22-24 pcs/min |
Input Voltage | AC200V - 240V, 50HZ |
Input Air Pressure | 0.5 -0.8 MP |
Dimensions | 4.5*1.6*1.9m |
OEE | 90% |
First Pass Yield | 99.5% |
Standard Parts Brand | Panasonic, Mitsubishi, SMC, Keyence, Omron |
Requested Operators | 1 |
Certificate | CE |
Machine Feature
Company Advantages
· The Yicheng automated assembly equipment is analyzed in depth in the original design.
· The product is carefully checked to ensure the maximized durability.
· With its precision calibration in automated assembly equipment market, Dongguan Yicheng Automation Equipment Co.,Ltd. gives full play to its superiority.
Company Features
· After years of efforts, Yicheng is known as a professional automated assembly equipment manufacturer.
· Yicheng has been developing and manufacturing new technologies to produce automated assembly equipment.
· We always keep technological innovations in mind to achieve the long-term development of automated assembly equipment.
Application of the Product
The automated assembly equipment produced by our company is widely used.
With a focus on customers' potential needs, Yicheng Automation has the ability to provide one-stop solutions.
After we complete the assembly and debugging of the equipment, we will inspect and select appropriate packaging materials to protect the equipment from shock, moisture, and fixation.
Make sure the equipment reaches its destination in good condition.
● On site installation, debugging, training and mass production follow up.
● 1 year Warranty from date of shipment, lifetime maintenance service.
● Response any defects claims within 4 hours for mainland customers.
● 12 hours for overseas customers by telephone or mail.
● Supply remote services by smart glass, team viewer, Teams and camera.
1. The technical training described below is free technical training, and no additional fees are charged. The technical training consists of the project's on site general manager, mechanical engineer and electrical engineer, who are responsible for implementing the entire training plan.
2. The whole process of installation from the installation to the commissioning is carried out by the expert group and the production technology, equipment management and production operators designated by the customer. At the same time, the expert group is responsible for technical guidance to the customer's technical staff throughout the implementation process. Training with technical points, including:
a. Equipment system principle and operation method, maintenance.
b. Equipment operation and debugging, parameter setting.
c. Operation and application of the software.
d. Operating procedures and precautions for the equipment.
e. Safety protection measures for various action agencies.
f. Maintenance of electrical systems and mechanical parts.
g. How to make correct judgment, analysis and how to troubleshoot when the equipment fails.
h. Solutions to possible dangerous situations.