Company Advantages
· The original design for automated assembly equipment is its biggest advantage.
· The system performs a basic quality evaluation for this product at every production stage.
· In customer service, the key to success for Dongguan Yicheng Automation Equipment Co.,Ltd. is quality- both in our relationships with others and with our product line.
Technical Parameters
Components Qty | 3 parts |
Cycle Time | 25-30 pcs/min |
Pneumatic Parts | FESTO |
Electrical Parts | Siemens |
Noise | LA eq < 70dB |
Dimensions | 3.5m(L)*1.8m(W)*1.9m(H) |
Weight | About 1200kg |
OEE | 85% |
First Pass Yield | 90% |
Standard Parts Brand | Panasonic, Mitsubishi, SMC, Keyence, Omron |
Requested Operators | 1 |
Certificate | CE |
Machine Feature
Company Features
· Yicheng is greatly popular in global automated assembly equipment market for its stable quality.
· As a high-tech enterprise, Dongguan Yicheng Automation Equipment Co.,Ltd. has full capability in technology innovation.
· At present, the company's short-term goal is to increase its competitiveness in the market and gradually stands out in the international markets. Check it!
Product Comparison
We demand ourselves in the production of automated assembly equipment with stricter standards. Based on this, we ensure that our products have advantages over the general products in the following aspects.
After we complete the assembly and debugging of the equipment, we will inspect and select appropriate packaging materials to protect the equipment from shock, moisture, and fixation.
Make sure the equipment reaches its destination in good condition.
● On site installation, debugging, training and mass production follow up.
● 1 year Warranty from date of shipment, lifetime maintenance service.
● Response any defects claims within 4 hours for mainland customers.
● 12 hours for overseas customers by telephone or mail.
● Supply remote services by smart glass, team viewer, Teams and camera.
1. The technical training described below is free technical training, and no additional fees are charged. The technical training consists of the project's on site general manager, mechanical engineer and electrical engineer, who are responsible for implementing the entire training plan.
2. The whole process of installation from the installation to the commissioning is carried out by the expert group and the production technology, equipment management and production operators designated by the customer. At the same time, the expert group is responsible for technical guidance to the customer's technical staff throughout the implementation process. Training with technical points, including:
a. Equipment system principle and operation method, maintenance.
b. Equipment operation and debugging, parameter setting.
c. Operation and application of the software.
d. Operating procedures and precautions for the equipment.
e. Safety protection measures for various action agencies.
f. Maintenance of electrical systems and mechanical parts.
g. How to make correct judgment, analysis and how to troubleshoot when the equipment fails.