Technical Parameters
Components Qty | 3 parts |
Cycle Time | 3.2 sec/pc |
OEE | 90% |
First Pass Yield | 99.5% |
Standard Parts Brand | Panasonic, Mitsubishi, SMC, Keyence, Omron |
Requested Operators | 1 |
Certificate | CE |
Machine Feature
Company Advantages
· All specifications of our assembly machine are available.
· Equipped with advanced facilities, we focus more on the quality assurance.
· Dongguan Yicheng Automation Equipment Co.,Ltd. takes every measure to guarantee quality of assembly machine.
Company Features
· Dongguan Yicheng Automation Equipment Co.,Ltd. is a lively and enthusiastic manufacturer centered on assembly machine.
· We forge close partnerships with global customers. The constant and intimate interaction allows us to evaluate their needs better and to tailor products and services accordingly.
· Dongguan Yicheng Automation Equipment Co.,Ltd. is a company with lofty wishes and great ideals. It is a world-renowned assembly machine supplier. Inquire now!
Application of the Product
Yicheng Automation's assembly machine is widely used in multiple industries and fields.
Yicheng Automation provides customers with unique solutions to meet their individual needs.
After we complete the assembly and debugging of the equipment, we will inspect and select appropriate packaging materials to protect the equipment from shock, moisture, and fixation.
Make sure the equipment reaches its destination in good condition.
● On site installation, debugging, training and mass production follow up.
● 1 year Warranty from date of shipment, lifetime maintenance service.
● Response any defects claims within 4 hours for mainland customers.
● 12 hours for overseas customers by telephone or mail.
● Supply remote services by smart glass, team viewer, Teams and camera.
1. The technical training described below is free technical training, and no additional fees are charged. The technical training consists of the project's on site general manager, mechanical engineer and electrical engineer, who are responsible for implementing the entire training plan.
2. The whole process of installation from the installation to the commissioning is carried out by the expert group and the production technology, equipment management and production operators designated by the customer. At the same time, the expert group is responsible for technical guidance to the customer's technical staff throughout the implementation process. Training with technical points, including:
a. Equipment system principle and operation method, maintenance.
b. Equipment operation and debugging, parameter setting.
c. Operation and application of the software.
d. Operating procedures and precautions for the equipment.
e. Safety protection measures for various action agencies.
f. Maintenance of electrical systems and mechanical parts.
g. How to make correct judgment, analysis and how to troubleshoot when the equipment fails.
h. Solutions to possible dangerous situations.