Technical Parameters
Components Qty | 6 parts |
Cycle Time | 3.5 sec/pcs |
Dimensions | 3m(L)*2.5m(W)*1.9m(H) |
OEE | 85% |
First Pass Yield | 99% |
Standard Parts Brand | Panasonic, Mitsubishi, SMC, Keyence, Omron |
Requested Operators | 1 |
Certificate | CE |
Machine Feature
Company Advantages
· Yicheng assembly machine is delicately crafted by our adept professionals by using modern technology.
· The product combines versatility with excellent performance.
· The product, with so many good characteristics, is adaptable to various applications.
Company Features
· Dongguan Yicheng Automation Equipment Co.,Ltd. has dedicated to the R&D, design, and manufacture of assembly machine for years. We gradually take the lead in the market.
· We’re staffed by professionals. They include forward-thinking engineers, designers, experienced managers, etc. Their knowledge of manufacturing, operations, and project management allow the company to deliver the best results.
· Yicheng's vision is to serve as a leading assembly machine provider. Welcome to visit our factory!
Application of the Product
Yicheng Automation's assembly machine can be used in multiple industries.
Yicheng Automation insists on providing customers with comprehensive solutions based on their actual needs, so as to help them achieve long-term success.
After we complete the assembly and debugging of the equipment, we will inspect and select appropriate packaging materials to protect the equipment from shock, moisture, and fixation.
Make sure the equipment reaches its destination in good condition.
● On site installation, debugging, training and mass production follow up.
● 1 year Warranty from date of shipment, lifetime maintenance service.
● Response any defects claims within 4 hours for mainland customers.
● 12 hours for overseas customers by telephone or mail.
● Supply remote services by smart glass, team viewer, Teams and camera.
1. The technical training described below is free technical training, and no additional fees are charged. The technical training consists of the project's on site general manager, mechanical engineer and electrical engineer, who are responsible for implementing the entire training plan.
2. The whole process of installation from the installation to the commissioning is carried out by the expert group and the production technology, equipment management and production operators designated by the customer. At the same time, the expert group is responsible for technical guidance to the customer's technical staff throughout the implementation process. Training with technical points, including:
a. Equipment system principle and operation method, maintenance.
b. Equipment operation and debugging, parameter setting.
c. Operation and application of the software.
d. Operating procedures and precautions for the equipment.
e. Safety protection measures for various action agencies.
f. Maintenance of electrical systems and mechanical parts.
g. How to make correct judgment, analysis and how to troubleshoot when the equipment fails.
h. Solutions to possible dangerous situations.