Product details of the assembly line machines
Product Overview
Tested on several parameters of quality, the provided assembly line machines is available at pocket-friendly prices for the clients. This product has the characteristics of stable performance and good durability. The product has been widely used both at home and abroad due to its huge economic benefits and great market potential.
Product Description
Yicheng Automation's assembly line machines has the following advantages over products in the same category.
Technical Parameters
Cycle Time | 1200 pcs/hour |
Dimensions | 8.5m(L)*2.2m(W)*1.9m(H) |
Weight | About 1500kg |
OEE | 85% |
First Pass Yield | 99% |
Standard Parts Brand | Panasonic, Mitsubishi, SMC, Keyence, Omron |
Requested Operators | 1 |
Certificate | CE |
Machine Feature
Company Advantages
Dongguan Yicheng Automation Equipment Co.,Ltd. is a company that integrates R&D, production and sales with Assembly Machine,Automated Equipment,Automatic Assembly Machine as our main business. Yicheng Automation constantly improves product quality and service system. Our commitment is to provide quality products and professional services. Welcome customers and friends who are in need to contact us and look forward to reaching a friendly cooperation with you!
After we complete the assembly and debugging of the equipment, we will inspect and select appropriate packaging materials to protect the equipment from shock, moisture, and fixation.
Make sure the equipment reaches its destination in good condition.
● On site installation, debugging, training and mass production follow up.
● 1 year Warranty from date of shipment, lifetime maintenance service.
● Response any defects claims within 4 hours for mainland customers.
● 12 hours for overseas customers by telephone or mail.
● Supply remote services by smart glass, team viewer, Teams and camera.
1. The technical training described below is free technical training, and no additional fees are charged. The technical training consists of the project's on site general manager, mechanical engineer and electrical engineer, who are responsible for implementing the entire training plan.
2. The whole process of installation from the installation to the commissioning is carried out by the expert group and the production technology, equipment management and production operators designated by the customer. At the same time, the expert group is responsible for technical guidance to the customer's technical staff throughout the implementation process. Training with technical points, including:
a. Equipment system principle and operation method, maintenance.
b. Equipment operation and debugging, parameter setting.
c. Operation and application of the software.
d. Operating procedures and precautions for the equipment.
e. Safety protection measures for various action agencies.
f. Maintenance of electrical systems and mechanical parts.
g. How to make correct judgment, analysis and how to troubleshoot when the equipment fails.
h. Solutions to possible dangerous situations.