Technical Parameters
Components Qty | 2 parts |
Cycle Time | 2.3 sec/pcs |
Pneumatic Parts | FESTO |
Electrical Parts | Siemens |
Noise | LA eq < 70dB |
Dimensions | 1.5m(L)*1.6m(W)*1.9m(H) |
Weight | About 800kg |
OEE | 95% |
First Pass Yield | 99% |
Standard Parts Brand | Panasonic, Mitsubishi, SMC, Keyence, Omron |
Requested Operators | 1 |
Certificate | CE |
Machine Feature
Company Advantages
· Using high-quality materials, Yicheng assembly equipment manufacturers has been given an attractive appearance.
· This product is presented to customers after proper inspections.
· Dongguan Yicheng Automation Equipment Co.,Ltd. always create great customer service experience for clients.
Company Features
· Yicheng leads the assembly equipment manufacturers industry and quality is superior.
· We work with customers and partners across the globe, to bring even more ideas and product solutions to any project. Our products including assembly equipment manufacturers are distributed in many countries.
· Dongguan Yicheng Automation Equipment Co.,Ltd. seeks development through science and technology to manage benefits. Call!
Application of the Product
Yicheng Automation's assembly equipment manufacturers is widely used in the industry and is widely recognized by customers.
We have a professional team and can provide customers with the most appropriate solutions to help customers achieve their goals quickly and effectively.
After we complete the assembly and debugging of the equipment, we will inspect and select appropriate packaging materials to protect the equipment from shock, moisture, and fixation.
Make sure the equipment reaches its destination in good condition.
● On site installation, debugging, training and mass production follow up.
● 1 year Warranty from date of shipment, lifetime maintenance service.
● Response any defects claims within 4 hours for mainland customers.
● 12 hours for overseas customers by telephone or mail.
● Supply remote services by smart glass, team viewer, Teams and camera.
1. The technical training described below is free technical training, and no additional fees are charged. The technical training consists of the project's on site general manager, mechanical engineer and electrical engineer, who are responsible for implementing the entire training plan.
2. The whole process of installation from the installation to the commissioning is carried out by the expert group and the production technology, equipment management and production operators designated by the customer. At the same time, the expert group is responsible for technical guidance to the customer's technical staff throughout the implementation process. Training with technical points, including:
a. Equipment system principle and operation method, maintenance.
b. Equipment operation and debugging, parameter setting.
c. Operation and application of the software.
d. Operating procedures and precautions for the equipment.
e. Safety protection measures for various action agencies.
f. Maintenance of electrical systems and mechanical parts.
g. How to make correct judgment, analysis and how to troubleshoot when the equipment fails.
h. Solutions to possible dangerous situations.