Technical Parameters
Components Qty | 15 parts |
Cycle Time | 22-24 pcs/min |
Input Voltage | AC200V - 240V, 50HZ |
Input Air Pressure | 0.5 -0.8 MP |
Dimensions | 4.5*1.6*1.9m |
OEE | 90% |
First Pass Yield | 99.5% |
Standard Parts Brand | Panasonic, Mitsubishi, SMC, Keyence, Omron |
Requested Operators | 1 |
Certificate | CE |
Machine Feature
Company Advantages
· Yicheng assembly equipment manufacturers is produced using the lean production method.
· The quality of the product is guaranteed by our state-of-the-art facilities and advanced technology. Its quality has passed the strict test and is examined frequently. Thus its quality has been widely accepted by the users.
· The product can meet the various needs of application because of its critical characteristics.
Company Features
· With years of development, Dongguan Yicheng Automation Equipment Co.,Ltd. has made remarkable achievements in the R&D, design, and production of assembly equipment manufacturers.
· Dongguan Yicheng Automation Equipment Co.,Ltd. is actively promoting the commercialization of new assembly equipment manufacturers.
· Yicheng Automation will keep following the purpose of 'Think for customers, supply high quality products'. Contact us!
Application of the Product
assembly equipment manufacturers can be applied to different industries, fields and scenarios.
Through problem analysis and reasonable planning, we provide our customers with an effective one-stop solution to the actual situation and needs of customers.
After we complete the assembly and debugging of the equipment, we will inspect and select appropriate packaging materials to protect the equipment from shock, moisture, and fixation.
Make sure the equipment reaches its destination in good condition.
● On site installation, debugging, training and mass production follow up.
● 1 year Warranty from date of shipment, lifetime maintenance service.
● Response any defects claims within 4 hours for mainland customers.
● 12 hours for overseas customers by telephone or mail.
● Supply remote services by smart glass, team viewer, Teams and camera.
1. The technical training described below is free technical training, and no additional fees are charged. The technical training consists of the project's on site general manager, mechanical engineer and electrical engineer, who are responsible for implementing the entire training plan.
2. The whole process of installation from the installation to the commissioning is carried out by the expert group and the production technology, equipment management and production operators designated by the customer. At the same time, the expert group is responsible for technical guidance to the customer's technical staff throughout the implementation process. Training with technical points, including:
a. Equipment system principle and operation method, maintenance.
b. Equipment operation and debugging, parameter setting.
c. Operation and application of the software.
d. Operating procedures and precautions for the equipment.
e. Safety protection measures for various action agencies.
f. Maintenance of electrical systems and mechanical parts.
g. How to make correct judgment, analysis and how to troubleshoot when the equipment fails.
h. Solutions to possible dangerous situations.