PLC control system, to complete the feeding and assembling of housing, terminals, spring, button and other parts automatically, detects parts presence, the good products and NG products will be unloaded separately.
Technical Parameters
Name | Italian Standard Socket Automatic Assembly Machine |
Cycle Time: | 1200 pcs/h |
Machine OEE: | 85% |
First Pass Yield: | 99% |
Standard Parts Brands: | Panasonic, Festo, SMC, Keyence, Omron, Misumi and etc |
Requested Operators: | 1 person |
Certificate: | CE |
Dimension: | 5.5*3.5*1.9m |
Machine Video
FAQ
1. Are you a factory or trading company?
We are a CE and ISO-proved manufacturer specialized in automation equipment R&D and manufacturing in the fields of switches , motors , cooling fans , medical, and other industrial areas since 2007
2. How can we get the proposal and quotation sheet for automation equipment as per our request?
Pls kindly supply us with the following details as below:
2D/3D product drawings.
Capacity request
Samples send to our address for engineer evaluation.
After all, the information is obtained, We will try to send you the proposal for confirmation within one week!!!!!
As soon as you confirm our proposal, we will send you the formal quotation sheet ASAP.
3. Where is your factory located?
Our factory is located in Dongguan, Guangdong, China. Warmly welcome your visit to our factory. As soon as your schedule settles down, we can arrange for our driver to pick up you if it's necessary.
4. How long is the warranty of your equipment?
One-year warranty after receipt check upon delivery. And we will comprehensively provide you with all kinds of technical support services in the after-sale! And also, our engineers are available to service machinery overseas to help until the machine is in a good performance.
5. What is the packing of this machine? Is it suitable for shipment?
The machine will be wrapped with shrink film to avoid any scratches, and the outside packed with a standard wooden case. It is suitable for shipment. After you receive the machine, it's better to carefully check the overall appearance of the machine. Your comments back will be highly appreciated.
6. How about payment terms and lead time :
A: 50% deposit upon the contract, balance against the check, and acceptance before shipping.
B: It's around 70-100days after the deposit is paid.
(The lead time can be negotiated according to specific situations)
Related Products